Loading...
HomeMy Public PortalAbout2022-04-14_Council_Website Agenda Package_Item 7.4_2022-23 Operating & Capital BudgetMunicipality of Chester 2022-23 Draft Budget Council April 14, 2022 1 2022-23 Draft Budget CONTENTS by Section 1. Changes since Apr 7 version (page 3) 2. Budget Highlights (pages 4-6) 3. Departmental Budget Presentations a) Department Operating Budget Summary b) Program Operating One-Pagers + Capital Projects •Deputy CAO (pages 7-17) •Community Development & Recreation (pages 18-37) •Infrastructure & Operations (pages 38-60) •Financial & Information Services (pages 61-69) 4. Strategic Priorities (pages 70-74) 5. 5-year Capital budget (pages 75-78) 6. Debt Servicing Projections (page 79) 7. Reserves a) 2022-23 Summary (page 80) b) 5-year Projections (page 81) 8. Rate Setting (pages 82-88) 9. Operating & Capital “Parking Lot” (page 89) 10. Motions (page 90) 2 Changes from Committee of the Whole feedback - April 7, 2022 3 •Speed Radar Units (7) •$70,000 added to 22/23 Capital Budget (page 75) •Funded by Gas Tax •Welcome Signs (6) •$30,000 added to 22/23 Capital Budget (page 75) •Funded by Wind Energy Reserve (Economic Development) •Building Inspection Training Position •$50,000 added to Operating Budget - Contingency (page 10) •Funded by General Operating Reserve •Art Centre Budgeted Grant •$25,000 added to Operating Budget – Recreation (page 24) •Funded by Wind Energy Reserve (Economic Development) •Future years to be funded by General Operating Revenue •EDU rate changed from $675 to $676.65 (page 84) •East Chester (District 3) Streetlight Area Rate changed from $0.081 to $0.022 per $100 of assessed value (page 85) -Taxes: -Property Taxes: $13,800,393 (up $1,104,189 from 21/22) - Residential Assessments up 9.3% (average 7.9%, capped at 5.4% for eligible properties) - Average assessed value $178,786 (21/22 $165,621) - Tax bill increase on average property is $93 ($63 if capped) - Commercial Assessments up 4.9% - Resource Assessments up 6.0% -Deed Transfer Tax: $1,790,000 (up $418,918 from 21/22 Budget) - 50% allocated to Infrastructure Development Fund -Landfill Fees: $3,469,402 (down $130,532 from 21/22) - Reduced volumes from controllable sources due to capacity until new Cell is completed -Gas Tax: $599,418 (down $570,582 from 21/22) - Payments were doubled in 21/22 -Private Roads Admin Fee: $6,019 (down $4,595 from 21/22) - Charge reduced from 10% to 5% Budget Highlights - REVENUE 4 - Total Operating Expenditures: $29,341,009 (3.8% increase from 2021/22 budget) - Salary, Wage, and Benefits: $5,373,957 (up $623,415 from 21/22) - Previously approved org structure changes: $434,108 - Cost of Living Adjustments (approved March 31, 2022): $194,772 - Movement within ranges: $106,860 - 2.0% vacancy allowance for turnover & recruitment: $112,325 - 21/22 projected: 5.5% - 20/21 actual: 1.4% - Non-Discretionary Expenditures: - Transfers to RCMP: $2,206,780 (up $219,406 from 21/22) - Insurance Premiums have gone up an average of 18.1% from 21/22 - School Board Contributions have increased along with assessment values - Library Contributions are up 26% - No amount budgeted for Sustane operations ($1,020,000 in 21/22) - Transfers to Reserves increasing due to allocation of Deed Transfer Tax Budget Highlights - EXPENDITURES 5 -Grants: - Budgeted: $138,190 - Council: $25,000 - Tourism: $8,000 - District: $70,000 ($10,000 per District) - Recreation: $20,000 - Youth Sponsorship: $4,000 - Leadership: $4,000 - Economic Development Sponsorship $6,000 - Wind Energy Reserve: $439,000 Budget Highlights – EXPENDITURES (cont’d) 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Project: Trail Bridge Inspections - King Street, Barry’s Brook #1 & East River Background:In September 2021 Design Point Engineering Services completed a Level II visual inspection of 11 trail bridges and provided a report that included a summary of the bridge conditions and recommendations for inspections, maintenance and repairs. The capital recommendations have been included in the 10-year capital investment plan. For 2022-23 there are three recommendations: 1. King Street Bridge, Concrete Condition Study $10,000 2. Barry’s Brooke #1, Level III Inspection $20,000 3. East River, Level III Inspection $25,000 Total $55,000 Objective: Provide safe trail infrastructure for the public through a comprehensive plan for trail bridge inspections and maintenance. Estimated Cost: $55,000 Source of Funds: Operating Reserve Timing:Completion of Inspections by Fall 2022. Back to Council?:Inspection report will be provided. 25 Project: East River Foot Bridge Background:The Municipality owns a small parcel of land adjacent to the East River, between HWY 3 and the Rum Runners Trail. Recreation & Parks staff have built a short semi-rustic trail and have conducted several guided hikes on this property over the past few years. In order to connect the property to the rail trail a small bridge over Barry’s Brook needs to be built. Objective: To provide a connection from the Rum Runners Trail to the Municipal property by installing a footbridge. The bridge allows trail users to explore of the riverbank area and fits into the larger trail connectivity for the area including to the north side of the Rum Runners Trail where hikers will be able to visit a small waterfall. Estimated Cost: $25,000 Source of Funds: $16,000 Grant & $9,000 Gas Tax Timing:Construction Planned for August 2022. Back to Council?:No. 26 Project: Paved Shoulders Background:The Municipality has recent history of partnering with Nova Scotia Public Works to add paved shoulders to planned paving projects outlined in the 5-Year Highway Improvement Plan. NSPW is scheduled to complete paving in 2022-23 on Highway 3 from Trunk 12 Chester Basin to Vaughn Road Western Shore (6kms). Objective: To pave the shoulder of the road (1.2 meters) in order to provide Active Transportation options for residents. The Municipality has been interested in paved shoulders to make HWY 3 more accessible, safe and comfortable for more users (walking & biking). HWY 3 spans 37 kilometers from east to west and completion of this section would add 6 kilometers of paved shoulders to the existing 18.7 kilometers. Estimated Cost: $762,881 Source of Funds: (ICIP Project) Fed - $305,153 Prov - $254,268 MOC - $203,460 (Operating Reserve) Timing:Construction Planned for Construction Season 2022. Back to Council?:No 27 Project: Sidewalk & Trail Construction Background:Improve Active Transportation infrastructure through construction of sidewalks and trails. Objectives: •Improve the walkability of neighborhoods. •Create a safe space for pedestrians and an AT friendly community. •Build a healthy, active community. Estimated Cost: $1,263,598 Source of Funds: (ICIP Project) Fed - $505,439 Prov - $421,157 MOC - $337,002 (Operating Reserve) Timing:Construction Planned for Construction Season 2022. Back to Council?:RFD 28 Project: Sidewalk & Trail Construction (continued) Estimated Cost: $1,263,598 Source of Funds: (ICIP Project) Fed - $505,439 Prov - $421,157 MOC - $337,002 (Operating Reserve) Timing:Construction Planned for Construction Season 2022. Back to Council?:RFD 1.Highway 329 to Trail: 60 meters This short sidewalk extension will connect the existing sidewalk to the Rum Runners Trail Head and will create a safer crossing of HWY 329. Budget: $98,154 If ICIP application approved, MOC Contribution is $26,178 2.Highway 3 to Croft Road: 265 meters Connect existing sidewalks in Chester Basin and will provide a triangle of sidewalks in the core of the community. Budget: $283,769 If ICIP application approved, MOC Contribution is $75,681 29 Project: Sidewalk & Trail Construction (continued) 3. Our Health Centre to Pig Loop Road: 160 meters •This project fills in the gap between the existing sidewalk and Pig Loop Rd creating better access to this busy section of HWY 3. •Budget: $178,411 •If ICIP application approved, MOC Contribution is $47,582 4. Duke St to Victoria St: 660 meters •The current sidewalk ends at Duke St. This project extends the sidewalk to Victoria Rd. •Budget: $668,848 •If ICIP application approved, MOC Contribution is $178,382 5. Middle River (Haughn Property) Connector Trail: 700 meters •This new trail will serve as a connector for all users from the Rum Runners Trail to HWY 3 through the Municipal property. •Budget: $34,416 •If ICIP application approved, MOC Contribution is $9,179 Estimated Cost: $1,263,598 Source of Funds: (ICIP Project) Fed - $505,439 Prov - $421,157 MOC - $337,002 (Operating Reserve) Timing:Construction Planned for Construction Season 2022. Back to Council?:RFD 30 Project: Gold River Bridge Replacement Background:Based on an engineer report, the decision was made to close the Gold River Trail Bridge in September 2021. After some preliminary research and discussion with Council, direction was given for staff to pursue options to replace the existing bridge with a new bridge. Objectives: •Reinstate the trail connection over the Gold River so that all trail users have a river crossing. •Work with various partners to successfully reestablish the full connection of the Rum Runners Trail through the Municipality. •Seek bridge building professional opinions through an RFP process. Estimated Cost: $1,852,217 Source of Funds: (ICIP Project) Fed - $740,887 Prov - $617,344 MOC - $493,986 Timing:Construction TBD based on solution identified. Back to Council?:Options for solutions following Consultant work. 31 Project: Rapid Rectangular Flashing Beacons (RRFB’s) Background:One method to improve the safety of pedestrians crossing the road is by adding safety treatments to improve choke points. The addition of flashing lights (RRFB’s) at crossings will make drivers more aware of pedestrian activity. Objectives: •Improve road crossings for pedestrians. •Create an AT friendly community. •Support active, healthy lifestyles. 1. Highway 3 at Walker Cut Road Trail Crossing •Budget: $28,358 •If ICIP application approved, MOC Contribution is $7,563 Estimated Cost: $117,563 Source of Funds: (ICIP Project) Fed - $47,025 Prov - $39,185 MOC - $31,353 (Operating Reserve) Timing:Construction Planned for Construction Season 2022. Back to Council?:No. 32 Project: Rapid Rectangular Flashing Beacons (RRFB’s) (continued) 2. Highway 3 at East River Trail Crossing •Budget: $29,735 •If ICIP application approved, MOC Contribution is $7,930 3. Western Shore Highway 3 at Lawrence Hatt Rd •Budget: $29,735 •If ICIP application approved, MOC Contribution is $7,930 4. Chester Basin Highway 3 at Highway 12 •Budget: $29,735 •If ICIP application approved, MOC Contribution is $7,930 Estimated Cost: $117,563 Source of Funds: (ICIP Project) Fed - $47,025 Prov - $39,185 MOC - $31,353 (Operating Reserve) Timing:Construction Planned for Construction Season 2022. Back to Council?:No. 33 Project: Open Space Implementation Background:Continued implementation of the “Plan For Our Open Spaces”. 2021- 22 included the design phase and 2022- 23 the focus will be construction. Objectives: •Create exceptional open spaces that people will love and want to explore. •Protect and value the natural landscape while providing outdoor recreation opportunities. •Develop our campus of 5 gem properties. Estimated Cost: $302,750 Source of Funds: Operating Reserve Timing:Completion Scheduled for 2022 Back to Council?:No. 34 Project: Open Space Implementation (continued) 1. East River •ATV and bicycle parking, picnic area, wayfinding signage and trail construction. •Budget: $17,300 2. Castle Rock •Addition of new trail route to complement existing trails, additional signage, trail enhancements and new amenities. •Budget: $45,200 3. Gold River •Construct parking area, professional trail construction, signage and amenities. •Budget: $68,100 Estimated Cost: $302,750 Source of Funds: Operating Reserve Timing:Completion Scheduled for 2022 Back to Council?:No. 35 Project: Open Space Implementation (continued) 4. Haughn Property •Construct parking area, professional trail construction, signage and amenities. •Budget: $98,600 5. Moland Point •Construct parking area, trail construction, signage, amenities and all accessibility features. •Budget: $73,550 Estimated Cost: $302,750 Source of Funds: Operating Reserve Timing:Completion Scheduled for 2022 Back to Council?:No. 36 37 38 39 Project: ¾ Ton Truck - Municipal Properties Background:Infrastructure and Operations maintains a fleet of trucks that are maintained by a vehicle maintenance service contract. A new vehicle is typically purchased …. Objective: The truck will be used by the Public Works staff to perform ongoing maintenance and operations activities on various Municipal owned properties. Estimated Cost: $85,000 One-Time Cost Source of Funds: Operating Timing: Back to Council: Yes, prior to awarding tender 40 Project: Zero-turn Replacement - Municipal Properties Background:The Public Works staff utilize a zero-turn mower to complete lawn care on various municipal owned properties from Spring to Fall. Objective: To provide adequate equipment required to maintain the municipal properties and to provide the public with good service.Estimated Cost: $20,000 One-Time Cost Source of Funds: Operating Timing: 2022 Back to Council: No 41 Project: Trail Surface Upgrades - Municipal Properties Background:Trail surface conditions are assessed annually to identify priorities & timing. This section is scheduled for resurfacing in 2022 is 3 km’s in the Goat Lake area. Objectives: •Smooth & consistent trail surface that accommodates all trail uses. Activities include grading, pothole repair, ditching, etc. •Support active, health lifestyles. •Attract visitors to the Municipality/Province to experience trail network. Estimated Cost: $26,000 Recurring Maintenance Cost Source of Funds: Operating Timing: 2022 Back to Council: No 42 Project: Wild Rose Park Washroom Renovation Background: The Municipality of Chester owns and operates Wild Rose Park in Western Shore. The property includes two buildings, a storage shed as well as a public washroom. The public washroom building is old, in poor condition and needs significant renovation. Objective: •Continue to provide a washroom facility for park users and the public at large. •Improve the overall condition of the washroom so that it is user friendly. •Construct so the washroom facility is fully accessible. Estimated Cost: $100,000? Source of Funds: Enabling Accessibility Grant Timing:Summer 2022. Back to Council?:RFD. 43 44 45 46 47 Project: Manhole Repairs & Infiltration Reduction - Universal Sewer Projects Background:The current wastewater collection infrastructure is over 40 years old and requires repairs. Annually various section on sewer lines are cleaned and videoed as preventative maintenance. In addition manholes have been inspected and repairs documented. Over the year’s manholes have been undergoing repairs at the surface to prevent infiltration (groundwater entering the system through defects in sewer) and to bring to grade to provide accessibility for cleaning and any issues that may occur. An asset management plan is underway in which we will identify potential failures, infiltration etc. this will assist with budgeting long-term to maintain the collection system. Objectives: - Prevent infiltration into the system which reduces capacity and increases costs. - Prevent the release of untreated wastewater into the environment. - Prevent and possibly reduce sources of inflow through improper connections. Estimated Cost: $52,500 Multiyear Cost Source of Funds: EDU Timing: 2022 Back to Council: No. 48 Project: Pump Replacements - Universal Sewer Projects Background:The Municipality owns and operates six (6) Wastewater Treatment Plants of various sizes in the following communities: Chester Basin, Chester, Mill Cove, New Ross, Otter Point and Western Shore. Mechanical upgrades will ensure continued operation and maximize the lifespan of the pump stations Objective: The pump replacement ensures pumps are kept up to date, properly maintained and are able to ensure the system is working as designed. Estimated Cost: $31,500 – Recurring Maintenance Cost Source of Funds: EDU Timing: 2022 Back to Council: No. 49 Project: Mill Cove Wastewater collection extension - Universal Sewer Projects Background:The MOC approved a development agreement between the MOC and Aspotogan Ridge Golf Village Inc. The Municipality agrees to extend the service lines of the Mill Cove Wastewater System from the current location to the edge of the Developers property on Parkwood Drive to service Phase q of the development The design and engineering drawings for this wastewater sewer extension are complete. Objective: To provide wastewater service to Aspotogan Ridge upon confirmation of construction of the proposed development., as noted above. Estimated Cost: $52,000 (carried forward from 21-22) One–Time Cost Source of Funds: $26,000 Gas Tax & $26,000 EDU Timing: 2022 Construction Season Back to Council: For award following tender. 50 Project: Mill Cove Biofilter - Universal Sewer Projects Background:The Mill Cove Wastewater treatment plant will require additional capacity for the additional proposed development in the area. The exact timing unknown presently but appears to be imminent. Design in 2022/23 with the potential to construct thereafter, Budget may require adjustment. Further investigation as to any possibility on site to expand following this last biofilter addition. I&I investigations are an important part of the capacity for this plant as per design scope. Objective: To provide capacity to serve the growth within the area for up to an additional 35-50 units to be confirmed Estimated Cost: $325,000 Source of Funds: Borrowing One–Time Cost Timing: 2022 design & construction Back to Council: RFD - Scope to be approved before tendering 52 Project: Green carts 250 – Solid Waste Background: The Municipality provides green carts for organics collection to all residents of MODC. The increase in budget is due to demand of repairs and replacements required. Objective: To provide residents of the Municipality a means to sort organics and provide collection service at the curb Estimated Cost: $35,000 Ongoing Cost Source of Funds: Solid Waste Area Rate Timing: Ongoing, underway Back to Council: No 53 54 Project: Landfill cell 3B design & construction – Solid Waste Background:The newest cell 4A had an estimated life of 20 plus years when Sustane was to be up and running two years ago. However, with Sustane not in operation the cell is filling up quickly and a new cell is needed. Design work is underway. Existing sedimentation ponds will need to be reconfigured and the additional leachate to be treated. This further justifies phase 2 of the leachate treatment upgrades to add a second equalization pond. Objectives: To provide the Municipality of Chester and its clients landfill capacity and uninterrupted and environmentally responsible service. Estimated Cost: $6,168,385 Source of Funds: Borrowing Multi-year project Timing: Construction Planned 2022 Back to Council: Yes, prior to construction award 55 Project: Leachate - Phase 2 (design work) – Solid Waste Background:An assessment of the Kaizer Meadow Landfill leachate treatment systems identified limiting factors for the system now and in future. Newer cells have higher strength and require additional capacity for treatment. In addition, there is leachate currently being stored in the landfill cells and volume reduction needed. Proposed upgrades were broken into phasing and Phase 1 was approved to be completed in 2020/21. Phase 2….. Objective: Maintain compliance and due diligence as per NSE permits and regulations. Phase 2: The addition of a second equalization lagoon and aeration equipment to increase treatment capacity by ensuring adequate retention time of the leachate before dispersal. Estimated Cost: $100,000 Source of Funds: Borrowing Multi-year project Timing: design 2022, construction 2023 Back to Council: RFD to authorize design. 56 Project: Heavy Equipment Compactor – Solid Waste Background:The Kaizer Meadow Landfill is operating aging heavy equipment that requires ongoing maintenance and repairs. Operational changes have been identified with the impending opening of Sustane has influenced decision making, in conjunction with our partnership with Valley Waste. Staff have drafted an equipment replacement plan with general rules to identify decisions as such based on the hours and/or usage (high/low). Objective: To maintain dependable and adequate heavy equipment to maintain the landfill site. Estimated Cost: $1,145,000 Source of Funds:$200,00 from Landfill Equipment Reserve, $200,000 from Solid Waste Area Rate & $745,000 from borrowing One-Time Cost Timing: purchase 2022 Back to Council: For award, following tender 57 Project: ¾ Ton Truck – Solid Waste Background: :Infrastructure and Operations maintains a fleet of trucks that are maintained by a vehicle maintenance service contract. A new vehicle is typically purchased as needed at the Kaizer Meadow Landfill. A new fleet management policy is being drafted and this truck is part of the new policy. Objective: Staff require trucks to complete various activities on and off the site, sampling, delivery and pickup of materials/parts, meetings, tours and movement on site. This truck will be needed to continue to maintain the fleet as older vehicles are retired. Estimated Cost: $85,000 Source of Funds: Solid Waste Area Rate One-Time Cost Timing: 2022 Back to Council: For award following tender. 58 59 60 61 62 63 64 65 66 Transfers from Operating Reserve - $284,000 •Salary & Benefits Review (CAO) - $85,000 •Ergonomics Assessment (CAO) - $12,000 •Contingency (Contingency) - $50,000 •Engineering Services – Community Wells (Municipal Properties) - $50,000 •Consultants (Planning) - $20,000 •Village Plan Review (Planning) - $15,000 •Procurement Policy Review - $2,000 •Building Inspection Training Program (Contingency) - $50,000 Operating Transfers from Gas Tax Reserve - $128,300 •Broadband internet (Economic Development) Transfer from Sewer Reserve - $21,807 •Budgeted Net Operating Cost (Sewers) Transfers from Wind Energy Reserve - $699,500 •Major Grants approved by Council on March 10, 2022 (Comm. Dev.) - $289,000 •Major Grants/Sponsorship approved by Council on March 10, 2022 (Econ. Dev.) - $150,000 •Kaizer Meadow Industrial Park Concept & Phase 2 Site Assessment (Econ. Dev.) - $130,500 •Business Retention & Expansion (Econ. Dev.) - $25,000 •Arts, Culture & Recreation Strategy (Econ. Dev.) - $25,000 •Exit 6 Growth Strategy (Econ. Dev.) - $50,000 •Invested in Operating Reserve - $5,000 •Art Centre Budgeted Grant (Econ. Dev.) - $25,000 – to be funded from general revenue in future years Transfers from Reserve and Prior Years Surplus 67 68 Transfers to Operating Reserve - $2,019,343 •Landfill Host fees (Landfill) - $210,726 •Solid Waste surplus (Landfill, Waste Collection, & Recycling) - $859,617 •Municipal Roads - $35,000 •Elections - $19,000 •50% of Deed Transfer Tax - $895,000 Transfer to Gas Tax Reserve (Fed & Prov Grants) - $599,418 Transfer to IT Equipment Reserve - $34,150 Transfer to Parkland Reserve - $2,500 Transfer to Wind Energy Reserve - $1,000,702 •Wind Turbine net gain (Wind Turbine) - $303,771 •Wind Farm Developer Tax (Property Taxes & GIL) - $696,930 •1/3 Allocated to each of Economic Development, Community Grants, and Operating Reserves Landfill Equipment Reserve - $0 •The 22/23 contribution of $200,000 will be used to purchase a Compactor within the same year, so it is reflected as a Capital from Revenue item Transfers to Reserves 69 Strategic Priority Area – Economic Development Description: Our ongoing commitment to investment attraction, business support services, and infrastructure encourages entrepreneurship, supports sustainable development of targets sectors and strengthens the commercial tax base. Priority Outcomes: 1. Partner in the development of infrastructure and opportunities for business development and attraction. 2. Promote and grow the Municipality’s economic sectors. 3. Position the Municipality as NS’s south shore community of choice for residents, businesses, and organizations, and as an international tourism destination 2022/23 Budget Initiatives: $25,000 Business Retention and Expansion $25,000 Arts, Culture and Recreation Strategy $128,300 Rural internet $100,000 Kaizer Meadow Industrial Park concept plan $30,000 Kaizer Meadow site assessment (phase 2) Funding sources other than tax revenue or debt: $128,300 Rural internet – Gas Tax Reserves $100,000 Kaizer Meadow Ind. Park concept plan – Wind Reserve $30,000 Kaizer Meadow site assessment (phase 2) – Wind Reserve $25,000 Business Retention and Expansion – Wind Reserve $25,000 Arts, Culture and Recreation Strategy – Wind Reserve 70 Strategic Priority Area – Environmental Stewardship Description: Our leadership in environmental stewardship seeks innovative approaches for sustainable community planning and decision- making that balances growth, invest in green business and infrastructure, enhances quality of life, and responds to the environmental impacts of climate change. Priority Outcomes: 1. Seek opportunities for innovation and leadership in waste management. 2. Explore options for integrating green energy and sustainable technologies in municipal infrastructure and program delivery. 3. Support environmental conservation & protection initiatives and efforts to tackle the impact of climate change. 2022/23 Budget Initiatives: $38,500 Water Quality Monitoring $50,000 Municipal Water Strategy (Community Wells Consultant) Financing Program for Home Water Services - $150,000 allocated for loans Funding sources other than tax revenue or debt: $50,000 Municipal Water Strategy (Community Wells Consultant) – General Operating Reserve 71 Strategic Priority Area – Governance & Engagement Description: Our governance and administration processes demonstrates a commitment to efficient and fiscally sustainable service delivery. Our commitment to communications & engagement provides residents, businesses, and organizations with access to services, information, and decision-making as meaningful participation in local government. Priority Outcomes: 1. Ensure municipal service delivery is efficient and effective, communicated and accessible. 2. Ensure municipal bylaw and policy frameworks reflect current and changing needs. 3. Continue to develop an asset management system that will inform decisions about infrastructure, development, levels of service, risk assessment, and associated financing. 2022/23 Budget Initiatives: $2,000 Procurement Strategy – expert review of revised policy $15,000 Village SPS & LUB policy – consultant to complete study Uniform Signage Bylaw (internal allocation of resources) $35,000 Municipal Salaries & Benefits Review $50,000 Human Resources Policy Review Funding sources other than tax revenue or debt: $2,000 Procurement Strategy – General Operating Reserve $15,000 Village SPS & LUB policy – General Operating Reserve $85,000 Municipal salaries & HR policy review – General Operating Reserve 72 Strategic Priority Area – Healthy & Vibrant Communities Description: Our ongoing engagement with partners and stakeholders supports vibrant and sustainable communities throughout our Municipality. Through long range planning that crates active and safe communities, and through the provision of accessible and inclusive programs and services, we work to improve quality of life for residents. Priority Outcomes: 1. Ensure residents have access to facilities, natural assets, programs, and services that enrich a quality of life and provide safe communities for residents and visitors alike. 2. Develop an accessibility, diversity, and equity lens for municipal services, and support partners in advancing accessible and inclusive communities. 3. Determine a municipal role in terms of protecting and increasing a broad range of housing stock to meet community needs. 2022/23 Budget Initiatives: $94,233 Accessibility Plan – Internal Action Plan Active Living Strategy (internal allocation of resources) Housing Toolbox (internal allocation of resources) Funding sources other than tax revenue or debt: $69,155 Accessibility Plan – Other Municipal Units 73 Strategic Priority Area – Infrastructure & Service Delivery Description: Through asset management practices that inform annual operations and maintenance programs as well as long term capital renewals and upgrades, we invest in public infrastructure. In response to ongoing changes in levels of service, regulatory requirements, population, and technological innovation, we work to provide infrastructure that is cost effective, reliable, and sustainable. Priority Outcomes: 1. Develop and implement evidence-based plans for future infrastructure and service needs, along with related funding models, to accommodate sustainable growth and levels of service. 2. Create efficiencies through innovative service delivery, and proactive maintenance and operations of existing infrastructure.. 3. Plan for and create infrastructure that improves the connectivity of roads, multi-use trails, natural assets and facilities as part of an active transportation network. 2022/23 Budget Initiatives: $50,000 Growth Strategy for Exit 6 Numerous Capital Budget Projects Funding sources other than tax revenue or debt: $50,000 Exit 6 Growth Strategy – Wind Reserve Capital Budget Infrastructure Project Funding includes Fed/Prov grants, and reserves (General Operating, Gas Tax, Landfill Equipment) 74 75 76 77 78 79 80 81 82 Budgeted Rates: •2022/23 = $676.65 (4.1% increase) •Subsequent increase 2% per year •As budgeted, Reserve balance will remain between $800K – $900K Factors affecting future years: •Expansion! •Increased EDU count •Increased Operating Expense 84 85 Undepreciated Asset Costs •Streetlight invoices from NS Power include usage & capital charges •In 2012, Province mandated transition to high-efficiency LED lights •Project was completed in 2021 and remaining capital charges on old lights were invoiced •Total cost = $15,628 •Data provided not sufficient to allocate accurately to individual area rates •Recommend funding with general funds (Streetlight rates would remain as presented on previous page) •Alternative options: •Apply cost evenly to all non-intersection rates in 22/23 - $0.0034/$100 increase to presented rates •Apply evenly over 5 years - $0.0007/$100 86 87 Rates Rate description 2022-23 2021-22 Residential / Resource $0.705 $0.705 Commercial $1.53 $1.53 Area rate – Solid Waste $0.1205 $0.1205 Sewer EDU fee $676.65 $650.00 Area rate - Mill Cove hydrant $0.28 $0.28 Area rates – streetlights - various see page 85 Others Area rates – fire protection - various TBD Area rate – Village commission rate TBD 88 Capital and Operating “Parking Lot” CAPITAL •Wastewater Upgrades & Expansion •Mill Cove Fire Protection •Aspotogan Wharf •Speed Radar OPERATING •South Shore Regional Hospital •Art Centre 89 That Municipal Council: •Approve the 2022-23 Capital budget in the amount of $12,794,394 •Approve the 2022-23 Operating budget, as presented, in the amount of $29,341,009 •Approve the 2022-23 reserve transfers as noted, for both capital and operating budgets •Set the residential tax rate at $0.705 per $100 of assessment •Set the commercial tax rate at $1.53 per $100 of assessment •Set the solid waste rate at $0.1205 per $100 of assessment •Set the sewer EDU rate at $676.65 per EDU •Set the streetlight area rates as noted on page 85 •Set the Mill Cove Hydrant rate at $0.28 per $100 of assessment REQUIRED MOTIONS 90