HomeMy Public PortalAbout2023-04-06_Bonny Lea Farm DA_Public Hearing Package.pdf MUNICIPALITY OF THE DISTRICT OF CHESTER A G E N D A PUBLIC HEARING Consideration of Development Agreement to facilitate the construction of a 313 sq foot 4-bedroom small options home and 2 identified future development sites at 725 HWY 14, Windsor Road (60141835). 6 April 2023, 8:45 a.m. Municipal Council Chambers, 151 King Street, Chester 1. CALL TO ORDER (CHAIR) a. The Agenda b. General Rules of Conduct c. Council’s decision governed by Chester Municipal Planning Strategy 2. COMMENTS BY MUNICIPAL SOLICITOR 3. OVERVIEW BY PLANNER a. Location and nature of proposal b. Municipal Planning Strategy policy analysis c. Summary of Advertisements and Meetings related to the draft development agreement d. Recommendations i. Draft Development Agreement 4. PRESENTATION BY DEVELOPER a. N/A. Developer available to answer questions 5. COMMENTS BY THE PUBLIC ON THE PROPOSAL 6. CLOSING REMARKS (CHAIR) 7. DECISION OF COUNCIL / DEFERMENT OF DECISION REQUEST FOR DECISION REPORT TO: Council MEETING DATE: 2023-04-06 DEPARTMENT: Community Development & Recreation SUBJECT: Bonny Lea Farm – Development Agreement to facilitate the construction of a 4-bedroom small options home and 2 identified future development sites ORIGIN: Motion # 2022-52 Date: February 15, 2023 Prepared by: Emily Statton, Planner Date: February 15, 2023 Reviewed by: Garth Sturtevant, Senior Planner Date: Authorized by: APPLICANT Dean Dumaresq on behalf of Bonny Lea Farm PROPOSAL Development Agreement to facilitate the construction of a 4-bedroom small options home and 2 identified future development sites LOCATION 725 HWY 14, Windsor Road (PID 60141835) as shown on attached Site Plan LOT SIZE 68 acres DESIGNATION Settlement ZONE Mixed Use (MU) SURROUNDING USES Vacant land on the backside (west), General Basic to the north, Mixed Use-industrial to the east, residential uses to the south NEIGHBOUR NOTIFICATION None to date. Public Information Meeting was held On January 10, 2023. There were 10 members of the public in attendance plus staff and the applicant. Request for Direction Page 2 Bonny Lea Farm Development Agreement March 30, 2023 If Council gives the draft document first reading, property owners within 30 m (98 ft) of the subject property will receive direct mail notice of the Public Hearing and a notice will be posted at the site. Has Legal review been completed? __X_ Yes ___ No ___ N/A Recommendation That Municipal Council give notice of intent to enter into a Development Agreement with Bonny Lea Farm to facilitate the development of a 313 square metre 4-bedroom small options home and 2 identified future development sites. Background By letter dated October 30, 2022 to the Council of the Municipality of District of Chester (MOC), by Dean Dumaresq of Bonny Lea Farm (hereafter referred to as the “Developer”), requested that Council consider entering into a Development Agreement to enable the development of an addition to the existing structures located at 5 Collicutt Road, Chester/725 HWY 14, Windsor Road (PID: 60141835). Request for Direction Page 3 Bonny Lea Farm Development Agreement March 30, 2023 Figure 1: entrance of Bonny Lea Farm The site has existing institutionally used structures. The site has multiple buildings on the lot; “S.S.W.A.P”, “Admin” building, “New Bark Barn”, “Maintenance Garage”, “Douglas & Bonita Church House”, “Douglas & Bonita House Shed”, “Mrs. Grace McClung House”, “Mrs. Anne Grant Flinn House”, & “Residential Training Unit”. These structures are used as care residence(s), vocational programs & social enterprises for onsite living, enhanced supports, gymnasium, industrial work area/shop, office space, etc.. The proposed new structure will be used as a care residence, similar to some of the existing “Houses”. Refer to Figure 2 & 3 below for reference to some existing structures on site. Figure 2 Existing structures on site, close to the new structure location Figure 3 existing structures near the new structure location Request for Direction Page 4 Bonny Lea Farm Development Agreement March 30, 2023 Subject Property The subject property is zoned Mixed Use (MU), while the surrounding uses include institutional uses, single dwelling residential uses and vacant land. The property is serviced by multiple entrances, however new structure will be accessed via the existing driveway; 725 HWY 14, Windsor Road. The property has multiple civic addresses and NSTIR approved entrances. There are eleven (11) existing structures on the 68-acre property that covers approximately 4000 sq. m in total floor area. The Land Use Bylaw allows development of institutional uses in the Mixed-Use Zone of up to 2000 sq. m. The proposed new structure will trigger a development agreement, as the total gross floor area of the entire lot exceeds 2000 sq. m. Discussion The proposed use for the new structure is intended to be the same as the current use on the property: institutional. The addition is to be constructed to have similar/matching façades to existing structures as shown in Schedule D ; intended to conform with the surrounding structures. The property boarders the General Basic zone to the north. Surrounding properties include Industrial uses (South Shore Concrete Products, Wood Sharps Limited, Municipal Groups quarry, RCMP). To the north-east of the site are existing residential dwellings, these homes are buffered by mature vegetated screening. After conducting a site visit it is noted that the property is surrounded by mature vegetation in all directions along the property boundary. There are several existing accessory structures on the site in addition to garbage bins and storage sheds shown on Schedule B. Accessory structures are regulated by the Land Use By-law. In addition, all new structures shall be located a minimum of ten (10) metres from all property boundaries is included in the Development Agreement. The proposed structure will have 24-hour medical staff on site to care for residents and there will be increase in employees and hours of operations (usually 7:30 a.m.-4:00 p.m.) Figure 4 Google maps aerial view of property Request for Direction Page 5 Bonny Lea Farm Development Agreement March 30, 2023 Considerations Use of Land There is a tennis court shown on Schedule “A” outlined in a dotted line. This, the related accessory shed and the “old bark barn” are to be removed in anticipation of the new structure. The existing area is shown in Figure 5 is to be demolished. The identified future development sites have been included in this Development Agreement as Bonny Lea Farm is planning for the future of their site and anticipated growth. The 2 (two) proposed future development sites are intended to keep in the same nature as the proposed new structure. The total gross floor area for the lot has already been exceeded, any additional structure on the site would require an amendment to the Development Agreement. This process is the same as a (regular) Development Agreement. Because of this, the applicant has decided to request including these future plans within this Development Agreement. The Development Agreement will allow future structures u to 650 sq m, however it will require many details at the time of a development permit. Things like setbacks from property lines and other structures, building details and parking requirements will be required, on top of the ‘regular’ requirements for a development permit. Construction Timelines The applicant has identified the appetite to begin construction/break ground early spring 2023. Site Plans (setbacks, parking, landscaping, accessory structures) Schedule A site plan(s) 1) Current site plan 2) Site plan with existing structures and proposed new structure 3) Trucking turning/access Figure 5 View of the to-be-demolished tennis court. Site of proposed new structure. Request for Direction Page 6 Bonny Lea Farm Development Agreement March 30, 2023 Schedule B calculation of total floor area coverage for all structures on the lot Schedule C stormwater management plan 1) landscaping & hardscaping 2) grading plan 3) storm calculations Schedule D elevation drawings of proposed structure 1) South & East 2) West & North 3) Building sections Schedule E floor of proposed structure 1) Main level 2) Basement level The site plans (Schedule A) were created by SP Dumaresq Architects LTD, which outlines the proposed new structure in relation to the existing structures, parking areas, property boundaries and accessory buildings (sheds). The dotted lines on “A2” are where the existing tennis court and related shed & “old bark barn” are located. These are intended to be removed prior to the new structure being built. The building footprints plan (Schedule B) created by SP Dumaresq Architects LTD outlines existing structures and a table recording the floor area for each structure, including the proposed new structure. The stormwater management plan (Schedule C) created ABLE Engineering and Land Surveying Services (ABLE) in conjunction with SP Dumaresq Architects LTD has been reviewed by the Public Works Department and no areas of concern have been raised. “C1” identified landscape & hardscape elements including parking/permeable surfaces. “C2” identifies grading for the proposed new structure. “C3” identifies the storm water calculations for pre & post storm events. The elevation drawings/renderings (Schedule D) were created by SP Dumaresq Architects LTD, illustrating the façade, and building material to be used. The structure is anticipated to be primarily vinyl and match the existing structures architecture and design. “D1” shows the basement & ground level public entrance (both south & east elevations). “D2” shows the west & north elevations and “D3” are section drawings. The floor plans (Schedule E) were also created by SP Dumaresq Architects LTD, illustrating the technical aspects and details of both levels of the proposed new structure. The main floor (Shown in E1) has 4 residential rooms each with their own bathroom (one room for bariatric), kitchen, communal dining & living room, spa room, laundry room, mudroom, elevator to downstairs as well as a stairwell. The basement level provides a multi-purpose room, storage, mechanical rooms, laundry room, washroom(s), Request for Direction Page 7 Bonny Lea Farm Development Agreement March 30, 2023 family room, medical and an office/nursing room for staff. The bottom level is intended to be used for public visits. Institutional Use The current use is institutional, and the addition is intended to be used as institutional as well, with a 4- room small options home. There will be no change in use required for this proposal. Roads, Ac c ess and Parking Access to the new structure is from Highway 14 and will be for staff and visitors. As noted above, the property is accessible by 3 entrances, however the main driveway used will be 725 HWY 14, Windsor Road. The applicant has provided plans identifying truck turning radius diagrams for entering & exiting the new structure. The applicant has provided a parking assessment of the existing parking lots. Policy A-24 in 9.7.2 in the MPS, refers to a parking calculation. This calculation is described in the LUB 4.16 below: 4.16 Parking requirements (LUB) 4.16.1 Where a development permit is required, the minimum requirement for on-site parking shall be one space for every dwelling unit and one space for every fifty (50) m2 of nonresidential floor area. The parking area(s) are calculated to be large enough for 84 total parking spots, 13 of those to be barrier free (for both the existing and proposed structures. As the structures are considered institutional, the development requires 87.5 (88) spaces as per 4.16.1 calculations for the floor area of the existing structures and the new proposed structure. Staff conducted a site visit and identified a possible over-flow location option for parking on the property. The new structure will be pr oviding parking spots for visitors and staff, as the 4 bedrooms will be occupied by those who stay onsite and do not use independent vehicular transportation. This building is proposed to have 15 parking spots, while only requiring 6.2(7) total parking spots as per 4.16.1 calculations. This number of parking spots is deemed satisfactory by Staff. Parking spots for the 2 future development sites are not included in this calculation. They will be required to meet the 4.16.1 calculation at time of a development permit application for the structure. Policy Analysis MPS Policy Policy Text Analysis Figure 6 View of entrance HWY 14 Request for Direction Page 8 Bonny Lea Farm Development Agreement March 30, 2023 9.7.1 General Development Agreement Policies A-24 When reviewing development agreements, Council shall be satisfied that: a) the development agreement conforms to the intent of the Municipal Planning Strategy and to the intent of any relevant Secondary Planning Strategies; Yes A-24 b) the development agreement conforms to relevant Municipal By-laws; Yes A-24 c) the applicable Public Participation Program has been followed and residents’ opinions have been carefully considered; and Ongoing throughout approval process and Public Hearing. A-24 d) the development agreement is in the best interest of the Municipality. Yes. A-25 When considering development agreements, Council shall be confident the proposal is not premature or inappropriate due to: a) the financial ability of the Municipality to absorb costs related to development; No issues anticipated, the site is not serviced by Municipal Sewer or Roads. A-25 b) the availability and capacity of Municipal services; No issues anticipated, the site is not serviced by Municipal Sewer or Roads. Public Works advises there is no water or sewer service available at this time therefore this is N/A. A-25 c) the adequacy of the site conditions for on-site services; Deemed adequate with existing structures. Plans show intention of installing on-site septic for new structure. No issues anticipated. A-25 d) the adequacy of stormwater drainage and its effects on water quality; Public Works advises the stormwater management plan adequately addresses the handling of additional storm water on the site resulting from the Request for Direction Page 9 Bonny Lea Farm Development Agreement March 30, 2023 development. This development will not have any impact on this system. Project engineer confirms the stormwater management plan will satisfy the stormwater standard contained in the Land Use By-law. A-25 e) inadequate access to schools, parks, emergency services, commercial properties and other local facilities; Distance to the nearest Fire Dept (Chester Village) is 6.4 km, EHS (Chester Village) is 6.4 km and RCMP (Exit 8) is 600m. Deemed satisfied by staff. A-25 f) a lack of street connections, sidewalks, paved shoulders, walkways or footpaths; Existing structure provides adequate street connections. No new driveway entrances, streets, walkways, or other connections are anticipated due to this proposal. The existing driveway entrance is to be upgraded/designed as shown in Schedule A. Public Works advises the street is an NSTIR owned and maintained. street/shoulder. There are no sidewalks or MOC footpaths at this location. A-25 g) a poor supply of on-site water for domestic uses or for firefighting; The Chief of Chester Fire conducted a site visit and concluded that the existing fire pond behind the farm (manmade) is not accessible via vehicle as the travel way is over-grown. The applicant is to work with the Fire Chief to resolve this and provide access as discussed. Proof of plans/intention of mitigation is to be provided prior to a development permit being approved/authorized. A-25 h) inadequate separations from watercourses, water bodies or wetlands from the ocean shoreline; or Nova Scotia 1:10,000 topographic data base shows a waterbody/watercourse (manmade pond for fire protection) near the site or requiring a buffer, approx. 200m in distance. Request for Direction Page 10 Bonny Lea Farm Development Agreement March 30, 2023 Public Works advises this policy is N/A as they have confirmed there are no water bodies in close proximity and the development appears to be 20m higher in elevation than the nearest waterbody. A-25 i) proximity to places of known or potential archaeological significance as indicated by the Province. Points towards to satisfy the policy. Reached out to province- awaiting response stating there are no known signs of archaeological significance in the surrounding area. Staff don’t see anything that leads to closely located archaeology. A-27 Developments that require a development agreement shall: a) maintain a vegetated setback between all main structures and any watercourses or water bodies; including (i) maintenance of a vegetated buffer of twenty (20) min depth from the mean high-water mark of a watercourse or water body; (ii) retention, replanting and maintenance of the vegetated buffer, in tree cover and understory vegetation to at least 75% of the linear water body frontage of the buffer, and not as a maintained, mowed lawn; (iii) allowance of a 3.5 m-wide opening in the vegetated buffer for access to watercourses and water bodies by means of docks, decks and pathways; (iv) allowance of minor accessory structures shall be permitted within the vegetative buffer so identified. Not in close proximity to any waterbodies so N/A. N/A N/A N/A All existing and proposed accessory structures are identified in Schedule A. No watercourses, waterbodies or wetlands in close proximity requiring setbacks, buffers or vegetated setbacks are present on the site. Request for Direction Page 11 Bonny Lea Farm Development Agreement March 30, 2023 A-27 b) include infrastructure designed to improve stormwater quality and reduce peak stormwater flows from the site; Public Works advises the proposed plans appear to be sufficiently addressed by Schedule C. Appears adequate to mitigate any additional flows. A-27 c) meet or exceed the Land Use By-law’s stormwater standards and watercourse buffers for comparable developments; Project Engineer confirms the Stormwater Management Plan meets or exceeds the Stormwater Standard contained in the Land Use By-law (Schedule C). Public Works advises no significant impact as a result of this development; not anticipated that the site’s stormwater drainage will adversely affect the recommended drilled ‘open bedrock well’ significantly. A-27 d) maintain all steep slopes, wetlands and areas prone to flooding in an undisturbed state. Stormwater Management Plan meets or exceeds the standard of the Land Use By-law, no issues with flooding are anticipated. Public Works advises this policy as N/A. 9.7.2 Commercial, Industrial, Institutional Development Agreements A-28 When considering commercial, industrial, or institutional developments by development agreement, Council shall be satisfied that: a) the development will not create undue traffic hazards, traffic congestion, or pedestrian hazards; The property has 3 access points/driveways. This development will use address 725 HWY 14, Windsor Road. The traffic in and out of the new small- options home will remain the similar to the current flow. The applicant has confirmed via statement that the new structure will not create undue traffic hazards, traffic congestion, or pedestrian hazards. A-28 b) the development will not generate emissions that unduly reduce the development potential The new building is creating 4 new rooms for residents. Exact calculations Request for Direction Page 12 Bonny Lea Farm Development Agreement March 30, 2023 and value of properties in the vicinity has been minimized; on emissions from the new structure have not been provided, however, the addition is in keeping with similar existing institutional uses, is intended to be a residential living environment and therefore is not anticipated to result in any substantial increase in emissions, particularly that would limit development potential on surrounding properties. A-28 c) for large-scale wind generation facilities: (i) the sound level generated by the installation shall not exceed the ambient sound level by more than 30dB(a) measured to the nearest property line, under any normal operating condition, and any application for a development agreement must include sufficient information to determine that the installation meets this standard; (ii) there shall be no illumination. N/A A-28 d) the development is separated from adjacent properties not in commercial or industrial use, and screening is used in order to minimize impact on the abutting uses; Mature vegetation/wooded area provide separation between the institutional use and nearby residential dwellings. The lot area is 68 acres and all structures are clustered in the east portion of the property, leaving ample distance for buffers along property lines. This vegetated buffer area will remain in place and will not be disrupted by the addition. A-28 e) all structures use durable building material, so their appearance complements the established character; Elevation drawings show structure keeping with similar façade as existing structures on site. Intention to use a vinyl and/or wood horizontal siding. A-28 f) all necessary permits have been issued or Council is satisfied that the required permits will be issued; No issues anticipated. Request for Direction Page 13 Bonny Lea Farm Development Agreement March 30, 2023 A-28 g) development shall not increase traffic volume so as to have an undue negative effect on properties served by a residential street; The new building is intended to be used as a care residence with 24/7 medical staff. The traffic in and out of the facility will remain the same as current flow. Staff and visitors of residents will be accessing the site, no increases in traffic volume is expected as confirmed by the applicant. A-28 h) the applicant demonstrates that the development can be appropriately serviced in a cost-effective manner; Will be using existing services that are provided/used by the existing structures surrounding. A new on-site septic system will be installed. A-28 i) a satisfactory parking calculation has been stipulated; parking area total: 84 spots (13 of which are barrier free spaces) existing structure(s) total: 4064.85 sq. m. (43 753.73sq. ft.) new structure total: 313 sq. m. ( sq. ft.) LUB: 4.16 Parking requirements 4.16.1 Where a development permit is required, the minimum requirement for on-site parking shall be one space for every dwelling unit and one space for every fifty (50) m2 of nonresidential floor area. The parking area(s) are large enough for 84 parking spaces, while the development requires 87.5 spaces as per 4.16.1 calculations. This is deemed satisfactory by Staff as the new structure is providing 15 parking spots, while only requiring 6.2(7) total parking spots. After a site visit conducted by staff there looks to be ample over-flow location options for traffic on the property. The new structure will be provided parking spots for visitors and staff and will be required to maintain all parking existing and proposed parking spots. Request for Direction Page 14 Bonny Lea Farm Development Agreement March 30, 2023 Parking spots for the 2 future development sites are not included in this calculation. They will be required to meet the 4.16.1 calculation at time of a development permit application for the structure. A-28 j) the applicant demonstrates that sewage disposal and any demands on the drinking water source will not negatively impact the quality and quantity of water resources; and The existing development is serviced by on-site septic and water systems. The addition is not anticipated to cause any need to upgrade as it will have its own septic system. An increase capacity has been anticipated by the applicant. The slope and sand filter sewage disposal was deemed acceptable by PW staff. The applicant has provided a Notification Receipt from Nova Scotia Environment. A-28 k) driveways, parking areas, and areas used for open storage shall be surfaced with stable materials to prevent erosion and to prevent dust from blowing onto adjacent properties. The current driveway/parking area is asphalt and is to be resurfaced with fresh asphalt. Schedule B identifies these areas. Public Information Meeting The Public Information Meeting was advertised in the Progress Bulletin, on municipal social media pages & website and on office doors. The meeting was held on January 10th, 2023, at 6:00pm onsite at the Bonny Lea Farms Gymnasium. There were 10 members of the public in attendance as well as staff, the applicant, Bonny Lea staff members and a Councilor. Comments were all in favour of the proposal and are summarized below: Questions for staff: • Details on timeline of DA process and when work can begin on site o Standard process takes 4-6 months to be completed. • Inquiry about the 2 identified future development site and how that process works o Details are not negotiated yet for DA but will likely include minimum setbacks from property lines which allows flexibility for Bonny Lea during design and finalization of plans (specific locations to be confirmed at development permit application and must conform with terms of DA). Questions for Bonny Lea staff: Request for Direction Page 15 Bonny Lea Farm Development Agreement March 30, 2023 • Who will the new home support? • What is the approval process for the (similar) project in Village of Chester? o Different regulations in Chester Village, the existing site at Bonnie Lee is all on one lot and therefore the overall size is now at a point that requires a Development Agr eement. The project in Chester Village is permitted “as-of-right” meaning that it only requires a Development Permit and does not require the same level of public meetings and input. Municipal Planning Advisory Committee Meeting The Municipal Planning Advisory Committee meeting was advertised in the Progress Bulletin, on municipal social media pages & website and on office doors. The meeting was held on February 15 th, 2023, at 6:00pm in Council Chambers (151 King Street, Chester). There were 8 committee members in attendance and the motion was made and voted unanimously in favour of Staff’s recommendation to recommend that Municipal Council to enter into a Development Agreement with Bonny Lea Farm to facilitate the development of a 313 square metre structure and 2 identified future development sites. Options 1. That Municipal Council enter into a Development Agreement with Bonny Lea Farm (South Shore Community Service Association) to facilitate the development of a 313 square metre structure and 2 identified future development sites. 2. That Municipal Council give notice of intent to enter into a Development Agreement with Bonny lea Farm, pending additional information or research. 3. That Municipal Council deny the request for a Development Agreement from Bonny Lea Farm for the purpose of constructing a 313 square metre structure and 2 identified future development sites. DEVELOPMENT AGREEMENT/MPS/LUB AMENDMENT APPLICATION Community Development Department PO Box 369, 186 Central Street Chester, NS B0J 1J0 E-mail: planning@chester.ca Phone: 902-275-2599 Fax: 902-275-2598 APPLICATION TYPE: Development Agreement Amendment to Existing Development Agreement Amendment(s) to the Municipal Planning Strategy, Municipal Land Use By-law, Village of Chester Secondary Planning Strategy or Village of Chester Land Use By-law Office Use CIVIC ADDRESS OR LOCATION OF THE PROPERTY: Application #: PID #: ZONE: Civic Street Name Community Electoral District: Receipt #: Property Owner: Name Applicant: Name Phone Phone Email Email Mailing Address Mailing Address Postal Code Postal Code The Applicant Property Owner Correspondence to? Applicant is… Contractor Property Owner Agent for Owner Other (please specify) Design Professional Other please specify PROPOSED USE: Provide a brief description of the proposed development SITE INFORMATION: Lot Area: ________ Lot Frontage: ______ Lot Depth: _____ BUILDING INFORMATION: Number of buildings: Existing _____ + Proposed _____ = Total _____ Total gross floor area of proposed use: ________ Maximum Height of Building(s): ________ MINIMUM SETBACKS: Existing Building Proposed Building Front Yard Front Yard Rear Yard Rear Yard Side Yard(s) Side Yard(s) Flankage Yard Flankage Yard PARKING: Number of Proposed Parking Spaces: Type of Proposed Parking: Surface _______ Off-site ______ Underground _____ Other ______ ZONE INFORMATION: Current Zone: ________ Proposed Zone: ________ SERVICING INFORMATION: Sewer: Municipal (connected) Municipal (proposed) On-Site (existing) On-site (proposed) Other (please specify) Water: Municipal (connected) Municipal (proposed) On-Site (existing) On-site (proposed) Other (please specify) FEES: No work on the file will begin until the application fee and advertising deposit are submitted with a complete Application Form. 400.00 Development Agreement Application Fee + $500.00 Advertising deposit 500.00 Municipal Planning Strategy/Secondary Planning Strategy Amendment (may also include LUB amendments) 500.00 Advertising deposit 300.00 Land Use By-law Amendment + $500.00 Advertising deposit 100.00 Non-substantial Amendment to Development Agreement 500.00 Advertising deposit OWNER/APPLICANT CERTIFICATION: I hereby certify that I am the owner of the land on which this development is proposed , or am making this application with the consent of the owner . (Please check which is applicable) Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Print Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: YYYY / MM / DD SUBMISSIONS MATERIALS CHECKLIST The following shall be submitted in support of an application for a Development Agreement or when amendments to the Municipal Planning Strategy (MPS) and/or Land Use By-law (LUB) are requested. Depending on the specific proposal, some items may not be required, or additional items not listed may be requested (ie. Traffic impact study, sun/shadow study, etc.). This information is required to document how the proposal will meet the intent of the Municipal Planning Strategy. Before applying, it is strongly encouraged to meet with Planning staff to discuss the proposal and ensure that required information is submitted. EMAIL: planning@chester.ca or PHONE 902-275-2599 to arrange a meeting with staff. SUPPORTING DOCUMENTS: DESCRIPTION INCLUDED Y/N Cover Letter A cover letter to provide an overview of the proposal, including any relevant information to be considered Yes No Application Fee Payment of the applicable Application Fee and Advertising Deposit Yes No Site Plan The Site Plan will become a part of the signed Development Agreement and must include the following: The plan shall be based on a recent survey or location certificate ensuring accurate property boundaries A scale (preferably metric) Identify and include dimensions for any proposed streets, existing or proposed rights-of-way, and easements. Location, dimension of existing and proposed lots Location of structures, existing and proposed, including setback distances from property lines, building dimensions, number of floors, gross floor area, number of units per floor and total number of units and any other relevant information Identify the use(s) for each building or room as applicable, building entrances, balconies, service entrances, outdoor storage areas and paved areas Location of parking spaces proposed to serve the development, including dimensions. Any existing or proposed pedestrian infrastructure such as trails, patios, decks, etc. Identify proposed phasing of the development including unit numbers and boundaries for each phase. North Arrow The date the plan was prepared, including any revisions Yes No Building Elevation Plans Building elevations plans for all sides of every proposed structure. The elevation drawing shall identify all significant architectural features including: design, materials, balconies, eaves and any other relevant details. Yes No Floor Plan Floor plan for every floor of all proposed structures. The plans shall include labels for the use of each room with dimensions. Yes No Landscaping Plan Identify proposed vegetation and existing vegetation to be retained. Identify existing or proposed screening such as fencing, Yes No berms, retaining walls etc. Include details on the type and size of plantings or propose a standard such as “providing an effective visual barrier below 10 ft and during all seasons when viewed from adjacent properties”. Lighting Plan Location and purpose for all exterior lighting fixtures, in addition to the anticipated impact on adjacent properties. Yes No Stormwater Management Plan(s) Plan(s) confirming the Pre-development flows on the site as well as a Post Development Plan to confirm flows once the project is complete. This plan should also include information on stormwater management features proposed during construction. Yes No Proposed Signage Details Location, dimensions, and design details for any proposed signage, temporary or permanent that is proposed as part of the development. Yes No PLEASE NOTE: When making application for a development agreement, MPS amendment or LUB amendment, it is recommended to also meet and discuss the proposal with: Municipal Building Official (902-275-3080 building@chester.ca), Municipal Development Officer (902-275-2599 development@chester.ca) and/or Municipal Engineer (902-275-1312 publicworks@chester.ca). This will help avoid delays in obtaining any other required permits or approvals. Non-refundable application fee, payable at the time of application. Advertising deposit covers the cost of advertising required public meetings. The deposit is refundable if the request is withdrawn and an unused amount remains. Personal Dignity & Worth through Productive LivingBonny Empowering people with disabilities since 1973 Planning, Development & Building Municipality of the District of Chester 186 Central St. Chester NS BOJ 1J0 October 31, 2022 Attention: Garth Sturtevant Re: Bonny Lea Farm Development Agreement Application — Fee Waiver Request On behalf of the participants, Board and staff of Bonny Lea Farm we would like request that the Municipality of the District of Chester waive the Development Agreement application fee and advertising deposit for our new small option home to be located on Bonny Lea Farm's Windsor Road property. Sincerely, Karen Lake Executive Director Bonny Lea Farm 5 Collicutt Road I PO Box 560 1 Chester, NS I BOJ 1J0 902-275-5622 COLLICUTT ROAD N. Middle River Rd Approximate tree line ROUTE 14 BONNY LEA FARM SITE Approx. 68 acres See Drawing 101 N N P r o p e r t y L in e P ro p e rt y L i n e P r o p e r t y L i n e P r o p e r t y L i n e P r o p e r t y L i n e See Drawing 101 Potential future devlepement Approx 3500sf PROPOSED NEW HOME CONSTRUCTION IN SPRING 2023 Potential future devlepement Approx 3500sf SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWING IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE KEY PLAN 26 Oct 2022 1 Development Agreement 1" = 100'-0" 100 EXISING PROPERTY PLAN Bonny Lea Farm Author September 28, 2022 1" = 100'-0"1 Key Plan Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" CDHGF B A F A G E AA AE 12 4 12 6 12 12 2 A610 A 10 ' - 0 " Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" 2 3 4 5 CEILING BEYOND SCREENED IN PORCH 61 C D AAAAAAFFFF A A A A D C 6 A603 12 10 12 10 12 10 12 10 12 8 1 A610 A GUARDRAIL SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWINGS IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE 26 Oct 2022 1 Development Agreement 1/4" = 1'-0" A202 Elevations Bonny Lea Farm Author 07 Sept 2022 1/4" = 1'-0"2 North Elevation 1/4" = 1'-0"1 WEST 1 THIS DEVELOPMENT AGREEMENT made in duplicate this day of , A.D. 2023 BETWEEN: SOUTH SHORE COMMUNITY SERVICE ASSOCIATION of the Municipality of the District of Chester in the Province of Nova Scotia, a body corporate having its head office in the community of East Chester and in the province of Nova Scotia, hereinafter called the “DEVELOPER(S)” OF THE FIRST PART -AND – MUNICIPALITY OF THE DISTRICT OF CHESTER, a duly incorporated municipal body, hereinafter called the “MUNICIPALITY” OF THE SECOND PART WHEREAS the DEVELOPER(S) intends to develop property(s) within the bounds of the MUNICIPALITY identified as PID number 60141835 described in Schedule “A” attached hereto; AND WHEREAS the DEVELOPER(S) has applied to the MUNICIPALITY for a Development Agreement to use the lands described in Schedule “A” attached hereto (Development Agreement Area), to construct a 4- bedroom small options home and 2 identified sites for future development, hereinafter referred to as the Proposed Development; AND WHEREAS the Site Plan attached hereto as Schedule “B” dated AUGUST 23, 2022 depicts the layout and project area of the Proposed Development; AND WHEREAS the Site Plan attached hereto as Schedule “C” dated OCTOBER 26, 2022 depicts the layout and project area of the Proposed Development; AND WHEREAS the Site Plan attached hereto as Schedule “D” dated October 26, 2022 depicts the stormwater management plan of the Proposed Development; AND WHEREAS the Site Plan attached hereto as Schedule “E” dated OCTOBER 26, 2022 depicts the elevation drawings of the Proposed Development; 2 AND WHEREAS the property(s) described in Schedule “A” are situated in an area which is both designated Settlement on the Generalized Future Land Use Designation Map of the Municipal Planning Strategy and Mixed-use Zone (MU) Zone on the Zoning Map of the Land Use By-law; AND WHEREAS the Council of the MUNICIPALITY, by resolution passed at the meeting on the day of , A.D. 2023, approved the execution of this agreement by the parties hereto; NOW THEREFORE THIS AGREEMENT WITNESSETH that in consideration of the foregoing recitals and for other goods and valuable consideration the parties hereto agree as follows: 1. DEFINITIONS The words and phrases defined in Part 1 shall apply to this Agreement. When interpreting words or phrases not defined in Part 1 of this Agreement, the Definitions section of the Chester Municipal Land Use By-law shall apply. Terms and phrases undefined in Part 1 of this Agreement and in the Definitions section of the Land Use By-law shall carry their customary meaning. 1.1 ADDITION means, the expansion to the existing structures on the lot with the addition of a new structure; 1.2 LAND USE BY LAW means, the Chester Municipal Land Use By-law; 1.3 PROPOSED DEVELOPMENT means, the 313 square metre structural 4-bedroom small options home as shown on Schedule “B”; 1.4 FUTURE DEVELOPMENT SITES means, the 650 square metre identified future development sites. 2. GENERAL REQUIREMENTS AND ADMINISTRATION 2.1 The MUNICIPALITY hereby agrees that Development Permits may be issued to the DEVELOPER(S) for the Proposed Development subject to Part 2.2, Part 2.3 and the terms and conditions of this Development Agreement; 2.2 This agreement governs the property described in Schedule “A”; 2.3 Nothing in this Agreement shall exempt the DEVELOPER(S) from complying with Federal, Provincial and Municipal laws, by-laws and regulations in force within the MUNICIPALITY, including the Building By-law, or from obtaining any Federal, Provincial or Municipal license, permission, permit, authority or approval required thereunder including any permission required under the Fire Prevention Act and the Environment Act; 2.4 The development can demonstrate adequate access for emergency vehicles, solid waste collection, as well as approval by the authority having jurisdiction for access to any public street and approval by the authority having jurisdiction for sewage disposal that the development can be adequately served by a sewage disposal system. 3. USE OF LAND 3.1 The DEVELOPER(S) undertakes to ensure that the use of the lands described in Schedule “A” attached hereto shall be limited to: 3 3.1.1. Construction, occupancy, and operation of structures devoted to an Institutional use up to 5027.85 square metres in total floor area, not including accessory structures. This shall be comprised of: 3.1.1.1. Continued occupancy and operation of existing “S.S.W.A.P”, “Admin” building, “New Bark Barn”, “Maintenance Garage”, “Douglas & Bonita Church House”, “Douglas & Bonita House Shed”, “Mrs. Grace McClung House”, “Mrs. Anne Grant Flinn House”, “Residential Training Unit” for institutional use including but not limited to: care residence, vocational programs & social enterprises for onsite living, enhanced supports, gymnasium, industrial work area/shop, office space, and other similar features as shown on Schedule “C”; 3.1.1.2. Construction of an additional structure (313 square metres) to the existing campus lot (NEW HOME) as shown on Schedule “B”; 3.1.1.3. Construction of identified future development up to 650 square metres, in addition to the existing campus lot as shown on Schedule “C”; 3.1.1.4. Maintenance of associated driveways, drainage works, and landscaping elements as shown on Schedule “B”. 4. PERIOD OF CONSTRUCTION The DEVELOPER(S) undertake to ensure: 4.1 that construction work on the property shall not begin earlier than 7:00 a.m. and shall not continue past 9:00p.m. 4.2 that any future developments on site must follow 4.1. 4.3 that that once construction is commenced, it will be proceeded with expeditiously so as to be completed within a reasonable time period. 5. STRUCTURES The DEVELOPER(S) undertake to ensure: 5.1 STRUCTURES, GENERAL: 5.1.1. that all new or relocated structures, not shown on Schedule “B” be located a minimum of ten (10) metres from all property lines. 5.1.2. that development on the site shall conform to the submitted Stormwater Management Plan Schedule “D”. The plan has been prepared by a qualified person and reviewed by Municipal Infrastructure and Operations and deemed acceptable to the MUNICIPALITY. The DEVELOPER(S) shall ensure that the construction, maintenance, and operation of Stormwater Management features on the site adheres to Schedule “D”. 5.1.3. The development shall not generate emissions such as dust, noise, radiation, odours, liquids, or light to the air, water, or ground so as to create a recognized health or safety hazard or to create a nuisance to adjacent uses. 5.1.4. The DEVELOPER(S) undertakes to ensure that all accessory structures shall comply with the Land Use By-law. 5.2 FUTURE DEVELOPMENT SITES 4 5.2.1. that an additional two structures similar to the proposed development are permitted on the property. 5.2.2. that future institutional structures up to 650 square metres total, to be permitted via development permit. 5.2.3. that future structures shall be located a minimum of 10 metres from a property line. 5.2.4. that future structure envelopes may be located within 1.5 metres of any other structure. 5.2.5. That building details will be required at Development Permit stage prior to receiving a permit. 5.2.6. That each future structure includes an increase in the total number of parking spaces to ensure the entire site remains in compliance with Part 7. 6. ROADS AND ACCESS 6.1 The development is served by a Provincial Public Road (Route 14). The site is served by existing driveways and no new road entrances are proposed. 6.2 New road entrances must be approved by the appropriate Provincial authority granted. 6.3 Resurfacing & repositioning internal driveways, parking areas and travel lanes shall follow details shown on Schedule “B”. 7. PARKING AND SCREENING The DEVELOPER(S) undertakes to ensure: 7.1 That existing structure’s parking spaces be maintained and stay intact at 84 parking spots as identified on the site. 7.2 For any future development sites, a minimum of one (1) parking space for every fifty (50) square metres of floor area, excluding washrooms and storage areas be maintained on the site. 7.3 Continued screening of parking areas, loading areas and any outside storage from adjacent properties and from the street. 7.3.1. Existing vegetation within three (3) metres of a side or rear property line shall be maintained or if disturbed, shall be replaced with an opaque fence of at least two (2) metres in height. 8. ILLUMINATION The DEVELOPER(S) undertakes to ensure that all outdoor lighting fixtures use the lowest wattage consistent with safety, use fixtures that reduce or eliminate glare and use fixtures that do not project glare or direct illumination onto adjacent properties. 9. SIGNS The DEVELOPER(S) undertakes to ensure that all permanent exterior advertising or project identification signs shall comply with the Land Use By-law. 10. OPERATION AND MAINTENANCE 10.1 The DEVELOPER(S) undertakes to ensure that all structures are maintained in good repair and in a tidy and useable state; 5 10.2 The DEVELOPER(S) undertakes to ensure that all access roads, service roads, driveways, parking areas and any areas used for open storage of equipment or stock shall be surfaced with stable materials to prevent dust from blowing onto adjacent properties and to prevent erosion. 11. FIRE PREVENTION The DEVELOPER(S) undertakes to ensure: 11.1 That adequate access to water for fire protection purposes is maintained through the existing fire protection system, including the pond located on site; 11.2 That existing driveway access, parking and turning area for fire vehicles shall be maintained. 12. LIABILITY 12.1 The DEVELOPER(S) undertakes to indemnify and save harmless the MUNICIPALITY from any claims, damages, expenses or costs arising out of, or in connection with, or incurred with respect to anything required to be done by the DEVELOPER(S) in accordance with this Agreement; 12.2 The indemnity above does not cover acts of negligence or misconduct on the part of the MUNICIPALITY. 13. CHANGES AND ALTERATIONS 13.1 That all matters in this Agreement not specified in Sub-clause 13.2 below, are substantial matters which shall not be changed or altered except by amendment to this Agreement in accordance with the relevant statutes; and 13.2 That the following matters are not substantial matters and may be changed or altered without amendment to this Agreement but with the written consent of the Council of the MUNICIPALITY provided that the Council of the MUNICIPALITY determines that the changes do not significantly alter the intended effect of this aspect of the agreement: 13.2.1. The precise location and placement of travelled ways and parking locations, subject to necessary approval by the appropriate Provincial authority granted. Such changes shall not result in the total number of parking spaces being reduced beyond the requirements of Part 7 of this Agreement. 13.2.2. The precise location of future structures subject to section 5.1 (setbacks), will require a submission of a revised site plan. 14. TERMINATION OF AGREEMENT 14.1 That this Agreement shall be in effect until discharged by resolution of the Council of the MUNICIPALITY in accordance with the relevant statutes; whereupon the Land Use By-law shall apply to the lands described in Schedule “A”; 14.2 That should the DEVELOPER breach any of the terms outlined in this Agreement, the MUNICIPALITY may pursue any remedy specified by the Municipal Government Act, specifically Section 264; 14.3 That the Council of the MUNICIPALITY may discharge this Development Agreement if the development described herein has not been commenced within twenty-four (24) months of the date of this Agreement; 6 14.4 That the Council of the MUNICIPALITY may discharge this Development Agreement if the use described herein is discontinued for a period of no less than twenty-four (24) months; 14.5 That the Council of the MUNICIPALITY retains the option of discharging this development agreement should any fact provided to the MUNICIPALITY by the DEVELOPER(S) or its agents constitutes a material misrepresentation of the facts upon which this Agreement is based; and 14.6 That the Council of the MUNICIPALITY may discharge this Agreement if the DEVELOPER(S) breach any terms of the Agreement and the DEVELOPER(S) have not proceeded to remedy any such breach in a timely fashion to the satisfaction of the MUNICIPALITY within ninety (90) days of written notice from the MUNICIPALITY. 15. APPLICATION OF LAND USE BY-LAW That without restricting the generality of the foregoing any aspect of any development on the property not specified above is subject to the requirements of the Land Use By-law. 16. EFFECT 16.1 That, in accordance with Section 229 of the Municipal Government Act, this Agreement shall continue to apply to the property until discharged by Council of the MUNICIPALITY; 16.2 That this Agreement shall enure to the benefit of, and be binding upon the MUNICIPALITY and its successors, and assigns and shall enure to the benefit of and be binding upon the DEVELOPER(S), its heirs, executors, administrators, and assigns, the owner or owners from time to time of the property described in Schedule “A”, until discharged by the Council; 16.3 The provisions of this Agreement are severable from one another and the invalidity or unenforceability of one provision shall not affect the validity or enforceability of any other provision. 17. OWNERSHIP The DEVELOPER(S) hereby certifies by the signatures affixed below that SOUTH SHORE COMMUNITY SERVICE ASSOCIATION is the sole owner of the properties identified as PID number(s) 60141835 as described in the attached Schedule “A”. The DEVELOPER(S) further certifies that they have not disposed of any interest in the property and there are no judgements, mortgages or other liens or encumbrances except as disclosed by registered title affecting the property in addition to those described herein. 7 IN WITNESS WHEREOF the parties to this Agreement have hereunto set their hands and seals on the day and year first above written. IN THE PRESENCE OF: BONNY LEA FARM Signature: Per: Print Name: Print Name: WITNESS Signature: Per: Print Name: Print Name: WITNESS Signature: Per: Print Name: Print Name: WITNESS Signature: Per: Print Name: Print Name: WITNESS MUNICIPALITY OF THE DISTRICT OF CHESTER Per: ALLEN B. WEBBER, Warden Signature: Per: Print Name: PAMELA MYRA, Municipal Clerk WITNESS 8 PROVINCE OF NOVA SCOTIA COUNTY OF LUNENBURG, ON THIS this day of , 2023, before me, the subscriber personally came and appeared________________________________________, a subscribing witness to the foregoing Indenture, who having been by me duly sworn, made oath and said SOUTH SHORE COMMUNITY SERVICE ASSOCIATION one of the parties thereto, duly executed the same in h_____ presence by affixing thereto its corporate seal identified by the signature of - ________________________ its ________________________ and ________________________ its ________________________, duly authorized officers in that regard. A BARRISTER/COMMISSIONER OF THE SUPREME COURT OF NOVA SCOTIA PROVINCE OF NOVA SCOTIA COUNTY OF LUNENBURG, ON THIS this day of , A.D. 2023, before me, the subscriber personally came and appeared________________________________________, a subscribing witness to the foregoing Indenture, who having been by me duly sworn, made oath and said that the MUNICIPALITY OF THE DISTRICT OF CHESTER, one of the parties thereto, duly executed in h_____ presence by affixing thereto its corporate seal identified by the signature of Allen B. Webber, its Warden and Pamela Myra, Municipal Clerk., duly authorized officers in that regard. A BARRISTER/COMMISSIONER OF THE SUPREME COURT OF NOVA SCOTIA 9 SCHEDULE “A” Legal Description - DEVELOPMENT AGREEMENT AREA SOUTH SHORE COMMUNITY SERVICE ASSOCIATION All that certain lot, pieces or parcel of land situate, lying and being at Windsor Road, in the County of Lunenburg, Province of Nova Scotia, conveyed by Percy Cooney et al to Bonita Church by Deed bearing date the 2nd day of April, A.D., 1962, duly recorded at the Office of the Registry of Deeds, Chester, N.S., on April 17, 1962, in Book 27 at Page 521 under No. 994, and therein described as follows: “ALL that certain piece or parcel of land situate, lying and on the West side of the said Windsor Road, so-called, in the County of Lunenburg, aforesaid, bounded and described as follows: “ALL that certain piece or parcel of land situate, lying and on the West side of the said Windsor Road, so-called, in the County of Lunenburg, aforesaid, bounded and described as follows: On the East by the aforesaid Windsor Road: on the South by Stephen Corkum’s land; on the West by the Eastern branch of Middle River, and the Middle River Road, so-called; and on the North by land of David Hawboldt and land of Prescot Collicut, and contain ninety (90) acres, more or less, and being the homestead of the late Patrick Cooney of Windsor Road, aforesaid. Being the lands conveyed to the said Percy Cooney and Alma Mary Cooney, deceased, by Deed dated 17th day of June, A.D., 1908, and recorded at the Registry of Deeds, Chester, N.S., in Book 12 at Page 560 under No. 394. The Last Will and Testament of the said Alma Mary Cooney being recorded at the Registry of Deeds, in Chester, N.S., in Book 27 at Page 162 under No. 299.” SAVE AND EXCEPTING THEREFROM HOWEVER that certain lot, piece or parcel of land and premises described as follows: BEGINNING at any iron post (with aluminum cap) set on the western boundary of Trunk Highway Number Fourteen (50 feet from centre line) at a point located Three Hundred feet (300’) from the Northeastern corner of lands now or formerly of Stephen Corkum; THENCE on a bearing North Eighty-three degrees Fifty minutes West (IM 83 degree 50’ W) in a line parallel with the Northern bound of said lands now or formerly of Stephen Corkum a distance of Seven Hundred feet (700’) to an iron post (with aluminum cap); THENCE continuing the same course in a straight line to the Eastern branch of the Middle River; THENCE Southwardly along the various courses of the said Eastern branch of the Middle River to the Northern bound of said lands now or formerly of Stephen Corkum; THENCE South Eighty-three degrees Fifty minutes East (S 85degree50’ E) along the aforesaid Northern bound of lands now or formerly of Stephen Corkum to an iron post (with aluminum cap); THENCE continuing the same course along the Northern bound of said lands now or formerly of Stephen Corkum a distance of Seven Hundred feet (700’) to the Western boundary of the Reserve of Trunk Highway Number Fourteen a distance of Three Hundred feet (300’) to the place of beginning. All bearings by the Magnet of 8 May, 1972. RESERVING from the above described lands under conveyance all Rights-Of-Way of the Nova Scotia Light & Power Company Limited and the Power Commission of Nova Scotia crossing the said lands and premises. W W W W W W WW W W W W W W W W WW SSSS SSSS SS SS SS SS SS SS SSSS SSSS S S S S S S S S ELCELC ELC ELC ELC ELC ELC ELC ELC ELC W W W W W W W W WW WW WW 2 7 5 ' - 0 " 280' - 0" 2 8 5 ' - 0 " 275' - 0" 275' - 0" 275' - 0" 280' - 0" 285' - 0" 2 8 0 ' - 0 " 2 8 5 ' - 0 " 290' - 0" 290' - 0" WW SSSS ELCELC PUBLIC ACCESS PARKING PUBLIC ENTRANCE RESIDENT ENTRANCE GARDEN MAINTENANCE GARAGE RED BARN BARK BARN OLD BARK BARN SHED VEG. GARDEN ROUGH AREA ROUGH AREA ROUGH AREA ROUGH AREA EDGE OF LAWN EDGE OF LAWN EDGE OF LAWNEXISTING GRAVEL DRIVEWAY EXISTING GRAVEL WOODED AREA WOODED AREA WOODED AREA WOODED AREA APPROX. LOCATION UNDERGROUND ELECTRICAL APPROX. SEPTIC MOUND TOP OF SEPTIC COVERS APPROX. SEPTIC MOUND PAVED DRIVEWAY HEATPUMPS GENERATOR REINFORCED CONCRETE PAD TO SUIT GENERATOR E X I S T I N G A S P H A L T P A T H PROPANE TANK PROVIDE BOLLARDS AS REQUIRED MIN. 4 PATHWAY EXISTING ASPHALT PATHWAY EXISTING GRAVEL SHED EXISTING LAMP POLE TO BE DEMOLISHED EXISTING LAMP POLE DOUGLAS & BONITA CHURCH HOUSE MAINTENANCE OFFICE SHED ATTACHED SHED SHED A S P H A L T S U R F A C E RAMP STEPS STEPS DECK WALKWAY STEPS STEPS RA M P STEPS APPROX. SEPTIC TANK 3 PIPE SEPTIC DISPOSAL FIELD APPROX. LOCATION EXISTING BONNY LEA FARM SIGN TENNIS COURT TO BE REMOVED APPROX. LOCATION OF EXISTING TREE TO REMAIN EXISTING SHED TO BE DEMOLISHED REDI-ROCK RETAINING WALL REDI-ROCK RETAINING WALL PATIO PATIO BOLLARDS 10' - 0"6' - 6"10' - 0"9' - 0" HOUSE MAIN FLOOR ELEVATION = 292' LOWER LEVEL = 280' +291.5 +286.5 +290 +291.5 +287 +288 +290 6' - 6 " 10 ' - 0 " 9' - 0 " 9' - 0 " 20' - 0" +278 REDI-ROCK RETAINING WALL +279.5 +279.5 CISTERN OVERFLOW VALVE PIPE (SEE CIVIL) +285 +289 +290 +291 U/G WATER SUPPLY TO WALL - SEE MECH AND CIVIL EXISTING TREES PROPOSED SEPTIC (SEE CIVIL) SLOPING SAND FILTER (SEE CIVIL) SWALE SWALE SWALE P.F. ALUMINUM FENCE MIN. 42" TALL P.F. ALUMINUM FENCE MIN. 42" TALL GATE GATE 4" PVC FOOTING DRAIN SITE LEGEND: APPROX. LOCATION OF WATERLINE APPROX. LOCATION OF SEPTIC LINE APPROX. LOCATION OF UNDERGROUND ELECTRICAL APPROX. LOCATION OF POWER POLE SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWINGS IS NOTE PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE 23 AUG 2022 1 For Tender As indicated A001 Proposed Site Plan Bonny Lea Farm Author August 2022 1" = 20'-0"1 Site Plan - Proposed N COLLICUTT ROAD N. Middle River Rd A p p r o x i m a t e t r e e l i n e ROUTE 14 BONNY LEA FARM SITE Approx. 68 acres See Drawing 101 N N SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWING IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE KEY PLAN 26 Oct 2022 1 Development Agreement 1" = 100'-0" 100 EXISING PROPERTY PLAN Bonny Lea Farm Author September 28, 2022 1" = 100'-0"1 Key Plan SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWINGS IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE 26 Oct 2022 1 Development Agreement C102 Storm Water Plan Bonny Lea Farm Author 07 Sept 2022 Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" C D HGFB G A A H H E G A E 12 12 12 12 12 6 12 4 2 A610 4' HIGH PICKET FENCE INCLUDING 2 GATES Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" 23456 1 A A B B A A 12 8 12 8 H GUARD RAIL SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWINGS IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE 26 Oct 2022 1 Development Agreement 1/4" = 1'-0" A201 Elevations Bonny Lea Farm Author 07 Sept 2022 1/4" = 1'-0"1 South Elevation 1/4" = 1'-0"2 East Elevation Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" CDHGF B A F A G E AA AE 12 4 12 6 12 12 2 A610 A 10 ' - 0 " Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" 2 3 4 5 CEILING BEYOND SCREENED IN PORCH 61 C D AAAAAAFFFF A A A A D C 6 A603 12 10 12 10 12 10 12 10 12 8 1 A610 A GUARDRAIL SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWINGS IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE 26 Oct 2022 1 Development Agreement 1/4" = 1'-0" A202 Elevations Bonny Lea Farm Author 07 Sept 2022 1/4" = 1'-0"2 North Elevation 1/4" = 1'-0"1 WEST Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" 2 3 4 5 3 A301 2 A301 61 A501 2 6 A603 FAUX BEAM 3 2X8s CLAD W/ 1" PINE RIDGE VENT Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" CD 1 A301F B A501 1 4' - 0 1 / 2 " AE A602 9 SUSPENDED CEILING MOD BIT UNDER SHINGLES (TYP. FOR CHESTER FLIP) V-JOINTED PINE -CLEAR COAT MIN 3 COATS RIDGE VENT Level 1 292' -0" T.O. Wall 300' -3" Basement Plan 280' -0" CDH 1 A301 G F B 4' - 0 " 10 ' - 3 " AE SUSPENDED CEILING SUSPENDED CEILING 2 A609 SCREENS DURADECK V-JOINTED PINE - CLEAR COAT MIN 3 COATS V-JOINTED PINE SOFFIT (TYPICAL ALL COVERED PORCHES) A609 3 Sim V-JOINTED PINE SOFFIT (TYPICAL ALL COVERED PORCHES) SCALE: DATE: DRAWN BY: Project Number GENERAL NOTES THIS DRAWING IS THE PROPERTY OF SP DUMARESQ ARCHITECT LTD. AND MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED WRITTEN APPROVAL. THE CONTRACTOR SHALL VERIFY ALL LEVELS AND DIMENSIONS ON SITE AND REPORT ALL DISCREPANCIES TO THE ARCHITECT BEFORE BEGINNING WORK. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE TO THE DRAWINGS WITHOUT THE ARCHITECT'S APPROVAL. READ THIS DRAWING IN CONJUNCTION WITH CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEWED BY: IF DIMENSION DOES NOT MEASURE 1" DRAWINGS IS NOT PRINTED TO SCALE 1" DATE #ISSUE PROJECT TITLE SHEET TITLE 26 Oct 2022 1 Development Agreement 1/4" = 1'-0" A301 Building Sections Bonny Lea Farm Author 07 Sept 2022 1/4" = 1'-0"1 Building Section 1 1/4" = 1'-0"3 Building Section 3 1/4" = 1'-0"2 Building Section 2 MUNICIPALITY OF THE DISTRICT OF CHESTER PUBLIC HEARING REPORT REPORT TO: Municipal Council SUBMITTED BY: Emily Statton Planner DATE: 06 April 2023 SUBJECT: 2022-52 MOVED by Councillor Church, SECONDED by Councillor Assaff that Council direct staff to prepare a draft Development Agreement for Bonny Lea Farm for a 4-bedroom small option structure and 2 identified future development sites on the 68-acre campus lot (PID 60141835) at 5 Collicutt Road, waive the application fees, and hold a Public Information Meeting on the proposal. Councillor Veinotte did not participate in the discussion/voting. Councillors Assaff, Connors, Church, Wells, Deputy Warden Shatford, and Warden Webber voted in favour. MOTION CARRIED. 2023-074 MOVED by Councillor Wells, SECONDED by Councillor Assaff that the Committee of the Whole recommend to Council to enter into a Development Agreement with Bonny Lea Farm (South Shore Community Service Association) to facilitate the development of a 313 square metre structure and two identified future development sites, and further, schedule a date for the public hearing. ALL IN FAVOUR. MOTION CARRIED. 2023-075 MOVED by Councillor Church, SECONDED by Councillor Wells that the Committee of the Whole recommend to Council that a Public Hearing be held on Thursday, March 23, 2023 beginning at 8:45 a.m. consider the matter to enter into a Development Agreement with Bonny Lea Farm (South Shore Community Service Association) to facilitate the development of a 313 square metre structure and two identified future development sites. ALL IN FAVOUR. MOTION CARRIED. (A) DETAILS OF DEVELOPMENT AGREEMENT Request from: Letter of request submitted by Dean Dumaresq of SP Dumaresq Architect LTD on behalf of Bonny Lea Farm (South Shore Community Service Association) requesting a Development Agreement to facilitate the construction of a 4-bedroom small options home and 2 identified future development sites dated October 30, 2022. Council discussed the request at a meeting held December 08, 2022, and directed staff to prepare a draft development agreement and related staff report. On March 02, 2023 Council considered a the draft development agreement. Request date: October 30, 022 per the date of the letter from Bonny Lea Farm requesting a development agreement. Nature of development agreement: Be it enacted by the Council of the Municipality of Chester as Follows: • Enter into a development agreement with Bonny Lea Farm to facilitate the construction of a 4- bedroom small options home and 2 identified future development sites. Purpose of development agreement: The development agreement is enabled by the Land Use By -Law zone standards; The mixed use zone allows institutional uses with a gross floor area of 2000m2, or more, by development agreement. The site has 11 existing structures. With the proposed additional structure, the total gross floor area will exceed that 2000m2. (B) MEETIN G DAT ES • 08 December 2022 – Request to Council from Bonny Lean Farm considered. Staff report presented preliminary details of the proposal and requested direction from Council to proceed with a draft development agreement & related staff report. • 10 January 2023 – Public Information Meeting held at Bonny Lea Farm Gymnasium (725 HWY 14, Windsor Road) • 15 February 2023 – Municipal Planning Advisory Committee Meeting held • 02 March 2023 – Council considered the staff report & MPAC recommendation, and gave 1st Reading to the draft development agreement • 06 April 2023 – Public Hearing held (C) DOCUMENT ATION Reports: • 08 December 2022- Staff Report: Request from Bonny Lea Farm to enter into Development Agreement • 15 February 2023 – Staff Report: Development Agreement and Policy Analysis • 02 March 2023 – Staff Report: Updated for Council 1 st Reading • 06 April 2023 – Report prepared for Public Hearing Advertisements (Progress Bulletin): • 04 January 2022: Notice of Public Information Meeting • 08 February 2023: Notice of Municipal Area Advisory Committee Meeting • 23 March 2023: Notice of Public Hearing (1st Notice) • 29 March 2023: Notice of Public Hearing (2nd Notice) Other notifications: • 15 March 2023 – Notice of Public Hearing Mailed to: o Municipality of the District of Lunenburg o Municipality of Kings • 15 March 2023 – Neighbour Notification Package sent to 14 properties (all those within 30m of a property proposed for development agreement) • 22 March 2023 – signs posted at entrance to 725 HWY 14, Windsor Road • Copies of all Progress Bulletin Advertisements posted on Municipal Website and Municipal Office doors • Social Media postings Fees paid: The applicant requested the advertising and application fees be waived as they are a Non -for Profit Organization. Council made a motion to approve this request. (D) WRITTEN SUBMISSIONS RECEIVED